Work

Work that shipped, and what changed after.

What each team was struggling with before, what I built, and what changed after. I measure what happens after handoff: defects, rework and time to ship.

01

Case studies

Vivo Energy · contracted via Rethink

The system that gave developers their time back

The development team had no design system, so every developer made design calls alone. I introduced a component library, page patterns and tokens, contributing to a 60 per cent saving in development time.


Read the case study →

IDEM · personal rebuild

Ten faults in a system I would have called working

A personal rebuild of a design system and token pipeline first contracted through Momentum Studio. I built the layer above the tokens on it, and in two days that layer found ten faults in a pipeline I would have said was in good shape.


Read the case study →

Let's build

Let's finish the next one.

Tell me what's unfinished. We start with one piece of work, at a fixed price.

Get in touch